Sunrun SEC Filings Detail Solar Change Orders and Data Discrepancies
Sunrun told investors it checked final solar designs against signed contracts and processed change orders when needed. Eleven years later, an SEC-filed KPMG report documented discrepancies in the system sizes and payment terms of sampled solar assets. The records show why a homeowner’s approved design and final contract details matter.
October 16, 2026
Sunrun described a formal change-order process
In a June 2015 registration statement filed with the SEC, Sunrun described what happened after a homeowner signed a solar agreement. An installer inspected the roof and measured shading, then prepared a final system design. Sunrun said it reviewed those plans against the executed contract and processed a change order when required. It also prepared a second production estimate and modified the homeowner agreement when the expected output changed beyond specified thresholds.
Sunrun still describes a final-design approval step on its solar installation page. The company says designers account for conditions identified at the property, make necessary adjustments and obtain the customer's final approval before plans go to permitting. The 2015 filing and current guidance both describe how revisions are supposed to enter the project record.
A 2026 review found discrepancies in solar-asset data
In July 2026, KPMG LLP, an accounting firm whose structured-finance services include agreed-upon procedures, prepared a report filed with the SEC for Sunrun Quintus Issuer 2026-2, a solar-asset financing transaction. The SEC filing identifies Sunrun as the company that paid KPMG for the work. KPMG selected 300 assets from a file containing 37,599 systems. Sunrun subsequently supplied a final portfolio file containing 37,595 assets. For the selected systems, KPMG compared specified data fields with material Sunrun provided, including contracts, design plans, amendments and change-order documents where available.
The report's Exhibit D lists discrepancies remaining after Sunrun revised the data. One selected system was recorded at 1.84 kW in the final file, compared with 2.28 kW in the supplied comparison information. Another was recorded at 11.13 kW against 10.92 kW. These figures describe differences in the records reviewed, rather than a count of panels on a homeowner's roof.
Other differences concerned payment terms. For one sampled agreement, the first-year monthly payment was $95.72 in the data file and $102.41 in the supplied information. For another, an annual escalator appeared as 2.90% in the data and 3.90% in the comparison material. The original review also recorded 108 inverter-manufacturer exceptions that Sunrun attributed to an Excel formula error; those entries were absent from the final exception table.
KPMG was hired to compare specified information used in the financing transaction. Its report says it made no representation about whether the customer contracts had been validly executed. It also did not inspect installed systems or determine whether individual homeowners had approved revised designs. The reported discrepancies establish differences between a financial data file and the material used to check it.
Why the final design matters to homeowners
Panel count is only one part of a solar design. Panel wattage, roof placement and the production model determine the system's capacity and expected annual generation. The final agreement also sets the payment terms and any production guarantee. In a separate 2026 engineering review filed with the SEC, sampled newer Sunrun agreements carried guarantee percentages of 90%, 85% or 0%, depending on the contract.
That makes the approved layout, system capacity, projected production, guarantee and price important records to compare whenever a design changes. Sunrun's 2015 filing described an internal process for revising those documents. KPMG's 2026 report shows that some system and payment information supplied for financing still differed across records after revisions.
Massachusetts law requires written modifications for covered work
Massachusetts General Laws Chapter 142A, Section 2 requires written, signed contracts for covered residential contracting work over $1,000. The state's home improvement contract guidance says modifications must be in writing and agreed to by both parties. For changes covered by that requirement, a phone conversation alone does not provide the written modification. Section 17(2) separately prohibits material departures from agreed plans or specifications without the homeowner's consent.
A written modification and the homeowner's consent address related requirements. The relevant contracts must first be identified: home improvement work and a solar lease or power purchase agreement can involve different agreements and parties. A document titled “change order” is one way of recording a modification, but the title of the document does not replace the need to show what was changed and what both parties agreed to.
Following the paper trail
Homeowners can compare the original sales proposal and executed contract with the final layout, building permits, utility interconnection records and installed equipment list. Sunrun's customer FAQ directs customers to agreement and design documents in the app or online account. The comparison should cover panel models and quantities, total capacity in kilowatts, projected annual generation, production guarantees and payment terms.
When those details changed, the next record to locate is the dated modification or other written approval of the revised specifications. That document connects the proposed system to the design ultimately submitted and installed. It is the practical question raised by Sunrun's own process and the differences documented in the SEC-filed asset review.
Primary sources
Sunrun's 2015 registration statement describes plan reviews and change orders. The July 2026 KPMG report identifies records and financial attributes checked for sampled solar assets, and the July 2026 engineering report describes performance guarantees. See also Sunrun's August 2026 Form 10-Q, its current FAQ and the FTC's solar consumer guidance.
Massachusetts sources: Chapter 142A, Section 2, Section 17 and state home improvement contract guidance.